Rateyard

STA 0+00Takeoff · Estimate · Bids

Price it with your own numbers.

Takeoff, estimate and bid tracking for earthwork, utility and civil site contractors. Your machines, your fuel price, your crews and your rock drive every line.

Preview build. Every name and number in it is sample data.

Drag to turn it. Cut and fill, staked out from a Stakeline bid.

STA 1+00The line you can check

Every unit cost is an equation you wrote.

Change the fuel price once and every line that burns diesel follows. Try it on the topsoil strip below.

Strip and stockpile topsoil, 6 in
Fuel
Cat D6 dozer
$212.50/hr
Operator
$68.00/hr
Fuel, 14 gal at $6.00
$84.00/hr
Crew cost per hour
$364.50/hr
Production
÷ 185 CY/hr
Unit cost
$1.97/CY

Sample rates. Yours come from your own workbooks.

STA 2+00From bid to proposal

Four steps, and none of them is retyping.

  1. 01

    A bid arrives

    Stakeline finds the letting or the private bid notice and hands it over. Nobody retypes it.

  2. 02

    The header locks

    Project name, GC details, bid date, start and finish. The GC is matched to a company record and you confirm it.

  3. 03

    Quantities become dollars

    Takeoff lines price from your own rate card: your iron, your fuel, your crew, your rock.

  4. 04

    The proposal prints

    Every line shows its math. Nothing prints until the header is complete.

STA 3+00Linked to Stakeline

Bids arrive already filled in.

Stakeline, Sivil's contractor intelligence app, finds the bid and knows the GC. Rateyard turns it into a project with the header filled, then asks you to confirm the contractor match. It never guesses silently.

  • Same bid sent twice never makes a second project
  • Missing GC details are flagged, not skipped
  • Your private data stays private

Open this bid in Stakeline · SMP-26-0817

Pine Bluff Road Widening and Storm Sewer

Sample County Roads Dept. · due 2026-12-03

GC on the notice: “Harlan Voss Constr.”

Rateyard · project header

GC
Harlan & Voss Construction, Inc.
Contact
Dana Whitlock, Chief Estimator
Phone
(402) 555-0142
Bid due
2026-12-03

Matched at 100%. Waiting for you to confirm.

STA 4+00What it fixes first

Built from what estimators say slows them down.

Drawn from public reviews of existing takeoff tools. Only the first item exists in this preview. The rest is the plan.

In this preview

Your rates, not ours

Bring your own equipment, fuel, labor and quarry rock workbooks. No retyping price lists into someone else's database.

Planned

The bid set stays put

Lock a bid set and swap in an addendum without losing the takeoff you already did.

Planned

Made for dirt and pipe

Cut and fill from surfaces, trench volumes, pipe runs and structures treated as first-class takeoff, not workarounds.

Planned

Fast on big drawings

Large civil sets open and pan without the lag that stalls a bid day.

See a bid turn into a project.

The preview opens on six sample bids. Confirm a contractor match, fill the dates, and watch a $620,784 estimate rebuild as you change a quantity.

Open the preview